Prep Sheet
Units, key dimensions and pallet plan for the day
Prep sheet for
Thursday, November 12, 2026
Handing 0 LH / 0 RH
Units
0
0 with build steps · 0 with notes
Sales orders
0
0 work orders
Pallets
0
to stage for the day
8'0 doors
0
Tall units on the sheet
Lines
0
Each loading to its own pallet size
No units scheduled for this day.
Pallets to stage
0 pallets
0 units
No units scheduled for this day.
Each sales order loads its own pallets up to that line's count — two orders never share a pallet, so an order's leftover doors take their own pallet. 8'0 doors take their own 8'0 pallet, slabs always go on the rack, and a last part pallet under the line's minimum goes on the rack too. Every unit's row says which it is.
Day pull list
0 materials
0 bins
No materials on this day's work orders.
No units scheduled for this day.